Set construction is the process undertaken by a construction manager to build full-scale scenery suitable for viewing by camera, as specified by a production designer or art director working in collaboration with the director of a production to create a set for a theatrical, film or television production.
The set designer produces a scale model, scale drawings, paint elevations (a scale painting supplied to the scenic painter of each element that requires painting), and research about props, textures, and so on. Scale drawings typically include a groundplan, elevation, and section of the complete set, as well as more detailed drawings of individual scenic elements which, in theatrical productions, may be static, flown, or built onto scenery wagons. Construction supervisors interpret the drawings and allocate labour and resources, with the Production Designer giving approval of the finished set on the Directors behalf.
The construction department is led by a construction coordinator. The coordinator reports to the art director and production designer and is in charge of budgeting and implementing designs. The construction coordinator, or construction company, provides all tools and equipment apart from small hand tools specific to a craftsman's work, such as screw guns, paint brushes and plastering trowels. This makes logistics and efficiency the responsibility of the construction manager and leaves each crew member as fluid freelancers to be hired and off hired at extremely short notice throughout the production.
No comments:
Post a Comment